A new approval path starts January 1, 2027
If you own land or are planning townhomes in San Diego, check whether your project qualifies for AB 1751’s streamlined pathway, which applies to proposed projects from January 1, 2027. The law, signed September 29, 2026, does not apply retroactively to existing homes.
The Missing Middle Townhome Ownership Act was signed September 29, 2026 as Chapter 781. It applies to qualifying projects in cities and unincorporated county areas, including charter cities. The Governor’s signing announcement lists the townhome approval measure among the state’s housing bills.
A qualifying application goes through a ministerial process: approval turns on whether the project meets the standards that apply, not on a judgment call about whether the project is wanted. The parcel still has to qualify, and the proposed development still has to meet the law’s requirements. Confirm those facts before you lean on AB 1751 in a purchase or a land valuation.
Check the project size and the site together
The law’s definition of a project allows up to 150 homes, with an average net habitable floor area of no more than 1,750 square feet. That is an average across the project, not a promise that every home will have the same floor plan. Under the law, a townhome has no more than three occupiable stories and either shares a wall or meets the fire-separation arrangement the law prescribes.
The project must also reach at least 75% of the density benchmark that state housing law refers to. A planning professional needs to work out which benchmark applies to the site. The minimum size of a newly created parcel is 600 square feet; that minimum says nothing about how big the home will be or how many homes a particular property can hold.
Site eligibility narrows things further. The single-family-zoned sites this provision covers must have no existing permanent residential structures, except structures that are both abandoned and uninhabitable. The subdivision provisions require service from a permitted community water system and a municipal sewer. For qualifying sites outside a U.S. Census-defined urban area, the law adds an infill test that looks at developed adjoining parcels on three sides.
That is why I would ask for a written site analysis before treating a possible townhome layout as part of a land price. A drawing with a home count on it does not settle utilities, access, existing housing or the approvals needed to build.
The existing housing history matters
The law protects certain existing housing and limits which sites can use this path. The prior-housing test looks back five years for a site that held five or more homes, and 15 years for the Ellis Act withdrawals the law specifies. Protected affordable housing and rent-controlled housing also need a careful look.
Environmental, historic and other location restrictions matter too. Ask the project’s planning team to identify the controlling maps, the statutory exclusions and any exceptions that apply to the parcel. Check fire, flood and other hazard classifications against the provisions themselves, not against a general description of the neighborhood.
The Coastal Act still applies. A coastal address alone does not settle whether a site qualifies, and AB 1751 does not do away with a coastal approval requirement. If you are looking at coastal land, you need the answer for that parcel.
Understand what you would own and maintain
Two townhomes can look the same from the street and be owned in completely different ways. Ask whether the purchase comes with its own lot, a condominium interest or some other arrangement, and get the recorded documents that spell it out.
AB 1751 limits a local government’s power to require a homeowners’ association, but it keeps an exception tied to California’s Davis–Stirling law for common-interest developments. It also allows arrangements for maintaining shared spaces. So owning your own lot is no guarantee of no association, no shared maintenance costs and no restrictions.
For a buyer, the practical questions are who maintains the roof, the shared walls, the private access ways and the other common improvements; how that work is paid for; and how decisions and disputes get handled. Weigh those obligations against the purchase price and the monthly cost of owning.
How the home is owned also does not guarantee you a mortgage or an insurance policy. Have the lender and the insurer look at the specific home and its documents. Where an association is involved, my San Diego condo and HOA due-diligence checklist lists the financial, insurance and disclosure records to ask for.
Some homes will carry affordability restrictions
Projects with 11 or more homes must generally set aside at least 10% for lower-income households, with the affordability kept in place for at least 45 years. If the local inclusionary percentage that applies is higher, the higher figure controls. The project’s approved documents decide how the requirement is met and which homes carry the restriction.
If you are buying a restricted home, the price is only part of the decision. Ask for the household qualification rules, the occupancy conditions and the rules for a future resale. Do not compare that home with an unrestricted one as if the terms of ownership were the same.
For a landowner, the affordable-home requirement belongs in the development numbers alongside the proposed home count and the construction and infrastructure costs. A project under the 11-home threshold still has to meet the law’s other conditions.
Check the parcel before buying or selling a lot on its own
The act’s rule on selling, leasing or financing a parcel separately generally requires a completed home or an existing permitted home on the parcel being transferred or financed. The rule applies parcel by parcel, with exceptions for common-area parcels and the last undeveloped parcel, and a possible local waiver.
Whether you are buying or selling, ask which provision allows this particular transaction and whether the building and subdivision approvals it depends on are finished. Do not treat a proposed subdivision map as proof that every new vacant parcel can be sold on its own right away.
The complete Chapter 781 text reproduced by LegiScan contains the project, subdivision and transaction conditions. Holland & Knight’s October 6 analysis also explains the final law and its limits.
Put the open questions into your transaction plan
Before making an offer on land, I would want the zoning and site analysis, the utility information, the history of any housing on the site and the basis for the proposed subdivision. Work out which approvals exist, which still have to be obtained and which assumptions are propping up the asking price.
Before buying a finished townhome, focus on the title and ownership documents, the maintenance obligations, any affordability restrictions that apply, and what the lender and insurer require. My buyer representation services tie those property questions to the offer and the investigation period.
The real opportunity is a qualifying path to a particular home or development. Build your decision to buy or sell around the property as the documents show it and the work still left to do.
Questions buyers and landowners ask
Does owning the townhome lot mean there will be no HOA or shared costs?
No. AB 1751 limits when a local government can require an association, but it keeps the Davis–Stirling exception for common-interest developments and allows arrangements for maintaining shared spaces. Check how the specific home is owned, its recorded documents and its maintenance obligations.
Can a developer sell every new lot before the homes are built?
Generally not. The rule on selling, leasing or financing a parcel separately applies parcel by parcel. It generally requires a completed home or an existing permitted home on that parcel. The law has exceptions for common-area parcels and the last undeveloped parcel, and it allows a local waiver. Check which provision supports the particular transaction; do not assume the whole project must be finished, or that any vacant lot can be sold.
Must a city approve any project described as townhomes?
No. The streamlined path applies only to projects and sites that meet the law’s conditions. Objective standards, site restrictions, tribal consultation and any Coastal Act requirements that apply all remain in place. The law also allows a denial based on written findings of a specified health or safety impact that cannot be satisfactorily mitigated. Calling a project “townhomes” does not by itself make it eligible.