Skip to content

San Diego Real Estate Guidance

Which Chula Vista Condos Are VA- or FHA-Approved? A Checked Project List

Published · Updated

A VA or FHA loan on a condo depends on the project as well as the buyer. The VA requires the condominium project to be approved. FHA insures a unit in an approved project, or in one that meets its single-unit rules. This page lists seven Chula Vista projects as they appeared in the two federal records on November 10, 2026.

A record is a starting point, not a loan approval. Approvals expire, some cover only certain phases, and one neighborhood name can hold two projects. Run both lookups again before you write an offer.

The list, as checked on November 10, 2026

FHA records come from HUD’s condominium lookup. VA records come from the VA’s condo report. Each FHA or VA line starts with the project ID to search.

Avalon at Otay Ranch

FHA: S011231. Approved through February 5, 2029. All 165 units.

VA: 000096. Phases 1 to 14. Accepted Without Conditions.

Aviare at Otay Ranch

FHA: S012620. Approved through October 27, 2029. Phases 1 to 11.

VA: 000317. Phases 1 to 11. Accepted Without Conditions.

Tosara at Otay Ranch

FHA: S012621. Approved through January 30, 2027. Seven phase entries, all 89 units.

VA: 000318. Accepted Without Conditions.

Tosara II at Montecito

FHA: S013787. Approved through May 29, 2027. Phases 1 to 5, all 75 units.

VA: 000658. Accepted With Conditions.

Mer Soleil

FHA: S003656. Expired May 30, 2021. All 293 units.

VA: 008301. Accepted Without Conditions.

Mosaic at Lomas Verdes

FHA: S003695, registered as Tapestry and Mosaic. Expired September 5, 2026.

VA: 007670. Phases 1 to 19. Accepted Without Conditions.

Cordova at Windingwalk

FHA: S003637. Approved through April 1, 2029. Five entries, by units and phases.

VA: 007731. Phases 1 to 15. Accepted Without Conditions.

The names are the ones the agencies registered. A listing may use a different marketing name for the same project.

How to read the two records

HUD’s lookup searches FHA condominium projects by name, condo ID, city and status. The statuses it offers are Approved, Expired, Rejected and Withdrawn, and each row carries an expiration date. In this list, the Withdrawn rows are duplicates or older entries that were combined into another ID. Avalon and Mosaic both have them.

The VA’s report shows one status per record. The records above read Accepted Without Conditions or Accepted With Conditions. For Tosara II, ask the lender for the conditions on file and whether they affect your unit.

Match the unit, not just the name

Three projects show why the name alone is not enough.

  • Tosara and Tosara II are separate projects with separate IDs. Their FHA approvals end on different dates and their VA statuses differ.
  • Cordova’s FHA approval is entered in five parts, by units and phases. The VA also holds a separate record for a single Cordova unit. When this list was checked, that record read Pending.
  • Mosaic’s FHA record sits under a combined project, Tapestry and Mosaic. The older Mosaic ID, S003660, is withdrawn and says to see the combined ID for status.

Get the unit’s phase and legal description from the title company or the association documents. Then have the lender confirm the project ID and the phase against the record.

When the FHA record is expired or missing

When this list was checked, the FHA project approvals for Mer Soleil and for Tapestry and Mosaic showed as expired. That does not always end the question.

HUD’s condominium page says FHA can insure a unit in a project that is not FHA-approved if it meets the single-unit approval requirements. The project has to be complete and ready for occupancy and have at least five units. It also has to meet FHA’s requirements on FHA loan concentration, owner occupancy and financial condition.

The lender decides whether a unit qualifies. The FHA single-unit approval guide goes through the steps.

The VA works differently. A condominium has to be approved by the VA for the loan to be guaranteed. If a project is not in the report, ask your lender how to request VA review of the project. The VA condo project approval guide covers that path.

Condo or townhome

Listings use both words loosely. California’s Department of Real Estate says in its guide to common interest developments that they come in no one structural type or architectural style. Ask the title company or the lender how the unit is legally held and which approval rules apply before you rely on either list.

What the lender still checks

A listed project does not approve the loan. The lender still has to approve you and the unit, and it confirms the project record and any conditions for itself.

Conventional loans have a project review of their own. See condo mortgage project approval.

Why this list carries a date

Each project was checked against the two agencies’ records on November 10, 2026. The records change. This page is not updated automatically, so treat it as a map to the right project IDs and run the lookups yourself before you offer. The same check for three other places is in the Downtown San Diego list, the Mission Valley list and the Oceanside list.

Questions buyers ask about VA and FHA condo approval

How do I check whether a condo is FHA approved?

Search HUD’s condominium lookup by project name, city or condo ID. Each record shows a status of Approved, Expired, Rejected or Withdrawn and an expiration date.

How do I check whether a condo is VA approved?

Search the VA’s condo report by project name, city or condo ID. Each record shows the VA’s status for that project, and some list the phases or the address they cover.

Can I use an FHA loan if the project’s approval has expired?

Possibly. HUD allows a unit in a project that is not FHA-approved to be insured if it meets the single-unit approval requirements. The lender decides whether the unit and the project qualify.

What does Accepted With Conditions mean on the VA record?

It is the VA’s status for a project it accepted with conditions attached. Ask the lender for the conditions on file and whether they affect the unit you want.

Does a townhome need condo project approval?

It depends on how the home is legally held. The word in the listing and the style of the building do not settle it. Ask the title company or the lender how the unit is held and which approval rules apply.